Yawa Aquatic Centre
Project Type: Waterpark
Location: Rosebud, Victoria, Australia
Yawa Aquatic Centre is an indoor, $37M, state-of-the-art recreation centre that opened in 2021 and offers a wide range of year-round aquatic, leisure, and wellness programs for people of all ages.
Prior to the installation of Life Floor, keeping the floor clean throughout the Aqua Play Zone proved difficult for facility staff. The pour-in-place surface contributed to significant health concerns for patrons due to extensive mold growth permeating the porous material. Exhaustive efforts to remove the mold were not successful, so Yawa Aquatic Centre decided to remove the entire pour-in-place surface and install Life Floor due to our product’s impervious, easy to clean nature.
Yawa Aquatic Centre boasts a playful beach theme complete with Waterplay spray fixtures, palm tree structures, and side wall graphics that reinforce this design. The customer selected our Montauk Theme to emulate a sandy beach. Within the gradient of square tiles, Mojave paths weave around the space to subtly guide circulation and avoid slide runouts. Inlays from our Marine and Sea Life sets provide pops of color and theming, tying into the designs of the Waterplay structure and features. A thicker area of Life Floor was installed around the slide runout to increase cushioning and safety for this high-impact area.
Life Floor Australia and New Zealand contracted an accredited installer, Maurer Construction Tiling, to adjust the concrete sub-base to improve drainage, reduce water pooling, and install Life Floor at this beautiful amenity.
Project Highlights
Facility: Yawa Aquatic Centre
Location: 100 Besgrove St, Rosebud, Victoria, Australia
Designer: Life Floor Studio
Install Date: May 2023
Area: 4,090 sq ft (380 m²)
Colors: Mojave, Sandstone, Gobi
Texture: Ripple 2.0
Thickness: 3/8”
Installer: Mauer Construction Tiling
Recent Projects