Doone Kennedy Hobart Aquatic Centre
Project Type: Zero-Depth Entry + Splash Pad
Location: Hobart, Tasmania, Australia
The renovation at Doone Kennedy Hobart Aquatic Centre in Tasmania began during 2020’s mandatory COVID-19 closure and included many updates to the facility including adding approximately 480 square metres (~5166 sq ft) of Life Floor on the surface of a large zero depth entry play area and on some of the walls and stairs to increase cushioning.
This Seashore Theme is arranged in a custom pattern replicating a beach with shallow water. Given Hobart’s temperate climate, this indoor haven is perfect for families who want to enjoy a beach day any day of the year. Marine inlays have been interspersed throughout the area to spark childhood imagination and increase overall play value at the centre.
Project Highlights
Facility: Doone Kennedy Hobart Aquatic Centre
Location: Hobart, Tasmania, Australia
Install Date: October 2020
Designer: Life Floor Studio
Area: 5,166 sq ft (480 m²)
Main Colors: Aviator, Iceberg, Sandbar, Gobi
Inlay Colors: Aviator, Limelight, Sunshine
Texture: Ripple 2.0
Thickness: 3/8”
Installer: Maurer Construction Tiling
Recent Projects